Indoor 20,000 Gallon Koi Pond



The Plans

The canvas

Front View

Aerial of the dug hole

The digging begins

Dug out and on the water table

10 tons of hardcore

Hardcore levelled

3 spirit levels say we're level!!

The pour

Waiting for the second load

The base is laid

Base dry and awaiting bricks

End of day one

High view of a days brick laying

Brickies are done

Front view - 3.2m window gap

Filter room

Small Window Frame 1.5m x .6m

Big Window Frame 3.2m x .6m

Block built one - 18ft long

Top view of BB one

Window in place

Nearly there!

Large Window Done

Small Window In Place

Current Overhead View

Conservatory Footings Dug

Dwarf Wall Underway

Brick Detailing
<< Start < Prev 1 2 3 Next > End >>

Results 1 - 30 of 71