The Plans
|
The canvas
|
Front View
|
Aerial of the dug hole
|
The digging begins
|
Dug out and on the water table
|
10 tons of hardcore
|
Hardcore levelled
|
3 spirit levels say we're level!!
|
The pour
|
Waiting for the second load
|
The base is laid
|
Base dry and awaiting bricks
|
End of day one
|
High view of a days brick laying
|
Brickies are done
|
Front view - 3.2m window gap
|
Filter room
|
Small Window Frame 1.5m x .6m
|
Big Window Frame 3.2m x .6m
|
Block built one - 18ft long
|
Top view of BB one
|
Window in place
|
Nearly there!
|
Large Window Done
|
Small Window In Place
|
Current Overhead View
|
Conservatory Footings Dug
|
Dwarf Wall Underway
|
Brick Detailing
|