Iain Kirkbright's 1650 Gallon Growing On Pond


Base for greenhouse marked out and boarded ready for concrete

Greenhouse Base
Hole for pond dug and centre maked

Pond Hole Dug
Bottom drain ready for placement

Bottom Drain Ready
Bottom drain placed and levelled

Drain In Place
Hardcore in pond base

Pond Hardcore
Hardcore in greenhouse base

Greenhouse Hardcore
Greenhouse and pond bases laid

Slabs Laid
Mika wondering what all the supplies are for.

Supplies Arrived
Slab and first row of blocks in place

Row One Laid
In-ground blocks backfilled

Concrete Backfilled
Greenhouse now constructed over pond

Greenhouse Errected
Another view - holding water already!

Holding Water
All block work completed

Built
Base for Nexus cast

Nexus Slab Laid
Foam lined and fibreglassed ready for top coat

PU Lined and Glassed
Top coat being applied

Being Flowcoated
Fibreglass completed

Flowcoat Complete
Filled - Finally

Filled
Slate copings on the top of the pond finish it off

Slate's
Greenhouse completed

The Greenhouse